So, while I was poorly with a runny bottom we had the bathroom fitters in. Having a toilet down was far from ideal under the circumstances, but it was better than cancelling and re-booking. A lot of work was required as we found 3 rotten floor joists and some mould in the bedroom next door. It's all done and looking good if I say so myself. Pics below -